Kitchen renovations Cape Town
CBD RDD Construction · Cape Town & Western Cape

Rate book guide: R9 500 / R14 000 / R22 000 per m, excluding VAT. Scope and quantities determine your total.
Start with the working triangle
Map the route between refrigerator, sink and cooking area, then note where people collide or walk through the work zone. The familiar triangle is a useful prompt, not a rule that overrides the room: a narrow galley, open-plan kitchen or island layout each behaves differently. Record appliance widths, door swings, window positions and the location of plumbing and electrical points. A layout discussion should distinguish fixed constraints from preferences, because moving services can add work. Consider where groceries are unloaded, where dishes dry and whether more than one person cooks at a time.
Cabinet storage by task
Group storage around real tasks: everyday crockery near the dishwasher, cookware near the hob and food near the preparation area. Deep drawers can make pots easier to reach, while shelves may suit lighter items or awkward corners. The correct choice depends on the contents and available clearances. Measure the items you want to store rather than relying on a cabinet image. Include fillers, end panels and appliance ventilation in the drawing; these details affect fit. A site measure is needed before final cabinet sizes or worktop cut-outs are ordered.
Worktops, splash zones and light
A work surface needs room for the tasks performed there, not simply a continuous premium material. Identify the busiest preparation zone and decide how it will meet the sink, hob and wall finish. Different surfaces have different cleaning and heat requirements; request the manufacturer’s care guidance for the selected product. Under-cabinet lighting can reduce shadows, but wiring and switching should be agreed before finishes close the wall. Check samples in the actual room because daylight, existing floors and artificial lighting change how colours read.
Keep services visible in the brief
Photographs and a simple measured sketch help a contractor understand the room, but they do not establish what lies behind a wall or floor. Mark visible water points, sockets, extractor routes and suspected leaks. Do not assume an appliance can move to a preferred location without checking drainage, power, ventilation and applicable requirements. If concealed damage or outdated services become apparent during removal, document the condition and agree the additional work and price before proceeding. This is more useful than treating an early estimate as a fixed promise.
Installation sequence and household access
A kitchen often becomes difficult to use once old units are removed. Discuss when water, power and cooking facilities may be unavailable, and whether a temporary arrangement is practical. Agree protection for floors and routes through the home, dust control measures, delivery access and where materials can be stored. The sequence commonly depends on removal, substrate repairs, service work, cabinet fitting and templating of certain worktops, but the actual programme depends on selected products and site conditions. Confirm lead times before setting expectations around completion.
Compare the written scope
A meaningful quote identifies removal, disposal, preparation, installation and finish items separately, with quantities and stated assumptions. Compare the same layout and specification across alternatives. Clarify whether handles, taps, sinks, appliances, tiling, electrical work, plumbing alterations and making good are included or excluded. Ask how variations are recorded and approved. CBD RDD Construction can discuss a kitchen brief and confirm actual scope and price on site; no price should be assumed from photographs alone. Keep the agreed selections and measurements with the accepted quote.
Measure before selecting
Make a room record before shopping: wall lengths, ceiling height, window sill, door openings and the position of visible pipes and outlets. Note which dimensions are uncertain and let the site measure resolve them. Existing floors may continue beneath cabinets or stop at their edges; this affects removal and replacement decisions. Keep a shortlist of priorities and identify alternatives if a preferred appliance size or finish is unavailable. The design should be checked against the actual room and selected product specifications.
Lighting and ventilation decisions
Include task lighting, general illumination and extraction in the same early conversation as cabinetry. Confirm existing duct routes and electrical points before choosing a hood or moving cooking equipment. A recirculating hood and an externally vented system are not equivalent; suitability depends on the building and product. Coordinate the visual finish with practical access for cleaning filters and replacing lamps. Record who supplies fittings and who makes the necessary connections.
Questions before you start
Can I keep my existing cabinets?
Possibly. Their condition, layout and fixing points need inspection; surface refreshes and selective changes are different scopes from replacement.
Should I buy appliances before the layout is final?
Wait until dimensions, service positions and clearances are confirmed. Appliance specifications can affect cabinet design and installation.